One plan for the house
The plan starts at the basement stairs and ends with the last attic box in its room.


The whole move runs on one plan: what comes out of the basement, garage, attic, and shed is logged alongside the bedroom and kitchen items. That list decides the load order and where everything lands at the new address. One schedule covers both ends of the trip.
Whole-home planning: one inventory that covers the house, garage, attic, and shed, and sets the loading order for the crew.
Full-service or labor-only: two ways to run it: we roll up with our truck and crew, or the crew loads your rental truck, trailer, or container.
Furniture pads and floor shields for the items and routes that need them.
Garage, shed, and yard: outdoor gear and storage spaces are logged with the rest of the household
Room-by-room delivery: boxes and furniture by room, including the basement and attic, with priority items placed first
Loading begins in the basement and garage, then works upward, so the truck gets packed in reverse order of unloading. That puts the rooms that need unloading first at the front. For big houses or long walks from the curb, the move can take two days, and the written estimate will say so before you book.


Moving a whole house is a different job from moving one sofa or a few boxes. If your move is about specific pieces rather than the entire household, the furniture moving page fits better; that service plans around named items instead of rooms.
The grill, the patio table, the lawn equipment, and the play set belong on the moving list, even when they sit in the shed or along the side of the house. They go on the same inventory as the indoor furniture, and the crew loads them in an order that fits the new yard or garage.


Learn what really drives a whole-home estimate in What a Move Across Northern Kentucky Actually Costs.

The path from the truck to the door sets the pace. Driveways, steps, hills, and how far the crew carries each piece all add time. Single-level homes are straightforward; apartments, townhouses, and gated communities can bring stairs, elevators, parking limits. Tell us about long carries, narrow doorways, and truck parking when you request the estimate, and list sofas and mattresses early so the crew size fits the route.

Book the move around your lease date and preferred weekday. We confirm the start time, crew size, and estimated hours before moving day. Most homes take three to eight hours, but three- and four-bedroom houses often need a crew of three or four and can run past one day when packing is added. If the day runs over, we stay with your approval and the hourly rate stays as written on the estimate.
With full service, we supply the truck, driver, and crew. You manage the packed boxes and choose where each item lands. Need packing help? We can take a couple of rooms or the entire house, and the estimate covers moving supplies. Add unpacking and first-night setup: beds made, essentials placed, so the kitchen works by dinner.
Start your estimate by sending both addresses, your moving date, and the home’s size.
The plan starts at the basement stairs and ends with the last attic box in its room.
The garage, shed, and both addresses are listed in one inventory.
The estimate lists the crew size, expected hours, and truck before you commit.
If dates or contents change, you get an updated estimate.
Hourly billing applies to whole-home moves. As a guide, a studio or one-bedroom runs about $300–$800, a two-bedroom $500–$1,400, and a three-bedroom $1,100–$2,800, with crews of two to four movers.
| Home detail | What to share | Effect on the crew | Confirmed in |
|---|---|---|---|
| Rooms | Number of rooms and how full they are | Sets the crew size and the hours | Written estimate |
| Outdoor items | Garage, shed, basement and yard items | Add volume that a room count misses | Written estimate |
| Access | Stairs, elevators and the walk to the truck | Change the carry time at each address | Written estimate |
| Optional help | Packing, unpacking and storage | Billed only if you add them | Written estimate |
Crew size, drive time, and any add-ons are all on the estimate.
Send the complete inventory, both addresses, and any steep driveway or long carry. The written plan lists the two-hour minimum and the arrival window before you book.
Aim for two to three weeks of lead time. Month-end moves need more notice, and weekdays are easier to schedule.
A typical house fits in one day. Large homes or difficult driveways might need two, and the estimate will show which.
Yes, include them in the inventory so the truck matches the load.
Sort out what moves and what goes to donation or the curb before moving day. The crew moves faster with a final list.
Yes, we reassemble anything we disassembled and place it in the room you pick.
A storage stop can be added to the plan. Just mention it when you ask for the estimate.
Find the Northern Kentucky cities where our crews move.
Apartment Moves in Erlanger: Elevators, COIs, and Building Rules
Cross-River Moves: Timing Cincinnati Traffic Into Your Moving Day
Downsizing for a Senior Move: A Room-by-Room Approach